Calibre Reports New High-Grade Sulphide Mineralization at its Gold Rock Project; Indications of Deep, Carlin-Type Feeder Systems; High-Grade Drill Results Include 6.8 g/t Gold Over 4.6 Metres and 6.6 g/t Gold Over 5.8 Metres
Calibre Reports Third Quarter and Year-To-Date Financial Results, Increased Growth Capital Spend to Accelerate Future Production Growth, on Track to Meet Full Year Cost and Production Guidance
Calibre Receives Environmental Approval for Development and Operation of the High-Grade Eastern Borosi Gold Project, and Achieves Zero Scope-2 CO2e Emissions in Nicaragua
Calibre Mining Reports Third Quarter Gold Production; Remains On Track to Deliver 2022 Production Guidance; Continues to Intercept High-Grade Drill Results
Calibre Continues to Expand the High-Grade Gold Discovery Along Strike at Panteon North within The Limon Complex; High-Grade Drilling Intersects 52.59 g/t Gold Over 3.8 Metres and 26.02 g/t Gold Over 8.1 Metres
Calibre Reports Drill Results from the Pan Mine in Nevada; Results Continue to Demonstrate Strong Resource Expansion Potential; Step Out Results Include 3.35 g/t Gold over 18.3 metres and 0.80 g/t Gold Over 47.2 Metres
Calibre Reports High Grade Drill Intercepts at its Gold Rock Project, Nevada; Advances Technical Studies with Positive Metallurgical Results; High-Grade Drill Results Include 2.19 g/t Gold over 44.2 metres and 3.36 g/t Gold Over 22.9 Metres
Calibre intersects Bonanza-Grade Gold at The Limon Complex; Reinforcing the Strong Potential to Add Resources and Expand the Panteon Mine; High-Grade Drilling Intersects 66.03 g/t Gold Over 5.6 Meters and 30.33 g/t Gold Over 5.0 Meters
Calibre Mining Receives Environmental Permit for Development and Operation of the High-Grade Pavon Central Open-Pit Mine Expected to Drive Production Increase in 2023